DAC

From James' Wiki
Revision as of 07:01, 24 August 2020 by J4m35 (talk | contribs) (Arrival Notes)
Jump to navigation Jump to search

Operational Notes

  • Typically planned on airway to DAC VOR

Arrival Notes

  • Without radar:
    • VOR DME ILS Rwy 14
    • Program in FMC ILS14 via DAC1
    • 250/5000, GD at DAC/10nm outbound fix works out nicely
    • For traffic sequencing ATC may require you to maintain DAC R-342 past the 10nm point, then issue clearance for ILS 14 - I.e. turn left to 174 to intercept LOC of 144 on your own
  • Usually ground will request number of crew and pax after landing

Departure Notes

  • Plan to depart no earlier than STD minus 30mins (?DAC ATC requirement)
  • Initial level FL290, can coordinate mid-climb for higher but must cross FIR boundary at that level
  • Sometimes SID is cancelled with a new clearance of after airborne track DAC Radial 161 during issuance of takeoff clearance
  • DG Embargo

References